Public

Moving Water Installation

men using the pipe loops on an Aqua Barrier cofferdam to position it onto moving water

Installation made easy...

The pipe loops allow for easy maneuvering during the installation. Use a spreader bar technique along with a shoreline anchor during installations where moving water is present.

Standing Water Installation

men unrolling an Aqua Barrier cofferdam onto the water

Installation made easy...

When the barriers are installed in static water no shoreline anchor is necessary. The barriers are buoyant and will float on the surface of the water.

The crew can simply unroll the cofferdam at the desired location.

Installation Procedures

There are three primary types of Aqua-Barrier™ Installations. The following descriptions of the various types of Aqua-Barrier™ installations are simplified and are only meant to give a general overview of the installation process. More detailed installation information should be provided by a trained Hydrological Solutions representative on all Aqua-Barrier™ installations.

Engineering Q&A

Available for Rent or PurchaseGet an Aqua-Barrier™ Price Quote Now!!!

How do the water filled barriers work?

a diagram showing a an Aqua Barrier in action.

Utility Line Work and Water Park Maintenance

This utility line installation on the Fox River in Yorkville, Illinois required a dry worksite.  650 linear feet of 5 foot high Aqua-Barriers™ were used to successfully complete the project.

 

Sediment Control and Shoreline Restoration

Need a temporary dam to provide sediment control?

caption

Aqua-Barriers™ were used to provide sediment control during the bridge construction of the JFK Causeway in Corpus Christi, Texas.

Call 1-800-245-0199 today so we can help you save time and money on your next project!

 

 

 

Pipeline Construction

 

~Do you have a pipeline construction project that requires a dry work area?              Carlyle Lake

~Do you want to gain an edge on your competitors?

~Do you want to save time and money?

Dredging, Intake/Outfall and River-crossing

Do you have a dredging project that requires construction dewatering?

The worksite is completely dewatered; the total installation time is merely 10 hours!

 

Concrete Repair, Canals, Culverts, Diversion Pipes

Concrete Repairs

~Do you have an underwater concrete repair?

~Do you have a concrete repair project that calls for a dry worksite?

Bridge Projects

~Bridge construction or repair that requires a dry worksite?

~Need an alternative to sheet piling that is environmentally friendly?

~Want to save time and money?

Aqua-Barrier™ is your Hydrological Solution!