Removal made easy...
When removal takes place in moving water, the water must first be equalized on both sides of the Aqua-Barrierâ„¢. Both ends of the barrier must have attached pipes controlled by hydraulic equipment arm (i.e. track hoe or crane).
Locate the drain ports located along the sides and ends of the barrier and remove the fittings. As the water drains from the barrier slowly elevate the ends of the unit using the hydraulic equipment arms.
Fold and roll the barrier in the same packaging configuration as received, place on the shipping pallet, and strap or band it down.
